Maintenance Method of Roller Mill Crusher's Event

cover photo

Maintenance Method of Roller Mill Crusher

Maintenance Method of Roller Mill Crusher

1) Before starting the equipment, the operator should carry out a comprehensive inspection of the Raymond mill, including bolt tightening in all parts, reducer oil level and bearing lubrication.


 


2) Raymond mill should start without load, and only when it reaches normal speed and has no abnormal condition can it start feeding. The feeding should be stopped before normal shutdown, and only after the material in the crushing chamber is discharged can the shutdown be stopped, except in special cases. No start-up with load is allowed.


 


3) After long-term shutdown or before the initial start-up, the roller mill crusher should be thoroughly checked to see whether the bolts are loose, whether enough lubricating oil is injected into the reducer, whether lubricating grease is added to the bearings, whether the wiring of the electrical circuit and the control switch is correct, whether the wiring is loose or not, and whether the material in the crushing chamber has been cleared. After confirming the correctness, start the Raymond mill and observe whether the direction of the Raymond mill is correct, then the Raymond mill can be officially started.

Category
Birthday
Time
Jan 10 2020 at 12:00 AM - Jan 05 2023 at 12:00 AM
Location
中国
Event Admins
kmei

Confirmed Guests